Our Experience

Your Engineering Advantage

Healthcare

UC Health

Deaconess Hospital Psychiatric Services Relocation

VT Design Solutions provided MEP Engineering and Design services for the renovation of the Psychiatric Intake Unit Relocation at the Deaconess Hospital in Cincinnati, Ohio. Renovations covered the 5th and 7th floors of the hospital and included patient rooms, nurse’s station, and patient intake area renovations, along with layout modifications and functionality changes to other areas. MEP scope included new wall mounted induction units, ductwork, grilles, heating hot water piping, and controls. System design included “suicide deterrent” designs for seclusion rooms. Installed new HVAC and control system for Negative Pressure Room. Client also required additional self-contained spot cooling units in designated areas in lieu of increasing the central HVAC system. New plumbing fixtures and piping were added for the restroom modifications. Revised power distribution and electrical wiring for all new equipment and components.

Timing: 2011

UC Health

Deaconess Hospital Frersing Wing Renovation

VT Design Solutions provided MEP Engineering and Design services for the renovation of the Frersing Wing at the Deaconess Hospital in Cincinnati, Ohio. Renovations covered a portion of the 5th floor of the hospital and included patient rooms, nurse’s station, and patient intake area renovations, along with layout modifications and functionality changes to other areas. MEP scope included new wall mounted induction units, ductwork, grilles, heating hot water piping, and controls. System design included “suicide deterrent” designs for seclusion rooms. Installed new HVAC and control system for Negative Pressure Room. Client also required additional self-contained spot cooling units in designated areas in lieu of increasing the central HVAC system. New plumbing fixtures and piping were added for the restroom modifications. Revised power distribution and electrical wiring for all new equipment and components.

Timing: 2011

UC Health

Hoxworth Blood Center 3rd Floor BMT Clinic Renovations

VT Design Solutions provided MEP Engineering and Design services for the renovation of the BMT Clinic at the Hoxworth Blood Center in Cincinnati, Ohio. Renovations covered the 3rd floor of the hospital and included combining multiple single rooms into single larger rooms and adding a new toilet room. MEP scope consisted of modifications to existing supply and return ductwork to accommodate new room layouts and meet current mechanical code and new restroom exhaust system. Installed new sinks, lavatories, and toilets along with associated plumbing. Added new receptacles, switches, and wiring as required. Removed, relocated, and added new voice and data outlets as required.

Services Provided: 2013

UC Health

Holmes Hospital Sports Medicine Clinic Pre-Moves

VT Design Solutions provided MEP Engineering and Design services for the renovation of the Sports Medicine Clinic Pre-Move at the Holmes Hospital in Cincinnati, Ohio. Renovations covered the 1 the hospital and included conversion of patient rooms to private offices and open areas, and the conversion of the nurses’ station into a reception area. MEP scope included the redesign of the fourth floor supply and return ductwork to accommodate new room layouts and meet current mechanical code. Refurbished and/ or replaced patient room sinks and faucets and installed new security flush valve for the drug testing toilet room. Project also demolished all medical gas outlets. Modified lighting in the patient rooms, hallways and new reception area. Added new receptacles, switches, and wiring as required. Removed the nurses’ call system. Removed, relocated, and added new voice and data outlets as required.

Services Provided: 2013